Laman

Monday, May 23, 2011

LEGIAN BEACH HOTEL & CANDI BEACH COTTAGE Updated

New development within Legian Beach Hotel and Candi Beach Cottage:
· Ocean Terrace Restaurant, Ole Ocean View Patio (OOVP) and also Lais Indonesian Restaurant have been upgraded and are now open with a new and upgraded look. (For Legian Beach Hotel).
· New mattresses have been in place in the premises. (For Legian Beach Hotel).
· To enhance your comfort with internet access, hotel have installed fiber optic in the entire premises and the hotel is now fully wi-fi connected. Hotel also offer free wi-fi internet access in all f&b outlets, poolside areas and certain room types. Start on 01 November 2011 hotel will provide free wi-fi internet access in all rooms. (For Legian Beach Hotel and Candi Beach Cottage).
· Traditional door lock system has been upgraded to proximity key card system and is being installed one by one. (For Legian Beach Hotel and Candi Beach Cottage). 

Properties doing upgrades to Superior Rooms at the main building, not at the cottages. New Superior Room has been completed, the upgrade of all superior rooms are being done block by block. (for the north wing in the building area first total 24 rooms, located on the 1st – 3rd floor). What is being done:

1. Changing all old furniture with brand new ones
2. Changing old TV with brand new flat screen
3. Installing DVD player with Ipod jack
4. Changing old mattresses with new ones
5. Changing lighting and plugs system with energy saving devices
6. Repaint the wall & ceiling in and out
7. Installing a bench that can also be used as extra bed when needed
8. Re-flooring. Here hotel do not hack/dismantle the old tiles, but using new technology where new marbles are glued on top of the old tiles





Hotel are also doing upgrades to Superior Rooms at the main building in Candi Beach Cottage, what being done is:

1. Changing all old furniture with brand new ones
2. Changing old TV with brand new flat screen
3. Installing DVD player with Ipod jack
4. Changing lighting and plugs system with energy saving devices
5. Repaint the wall & ceiling in and out
6. Installing a bench that can also be used as extra bed when needed
7. Re-flooring. Here hotel do not hack/dismantle the old tiles, but using new technology where new marbles are glued on top of the old tiles



0 comments:

Post a Comment